Previous DRIs
Number![]() |
Name | Town | Description | Decision Date |
---|---|---|---|---|
653 | Dias High Point Lane | Tisbury (Vineyard Haven) | To construct a 60’ by 60’ two-story metal building for wholesale lumber storage, an office, and an apartment. | October 1, 2015 |
653 M | Dias Mixed-Use High Pt. Lane | Tisbury (Vineyard Haven) | Construction of a 25,200 sf 3-story warehouse building with 2 studio apartments and a showroom. The Building would be two stories facing on High Point Lane and three stories tall (35') on the interior of the site which would be warehouse space with stacking open to the ceiling. | June 2, 2016 |
653 M | DRI 653-M-Dias Mixed Use High Point Lane | Tisbury (Vineyard Haven) | To construct a three-story mixed-use building with an 8,400 sf footprint. The building will consist of two sections: (1) a mixed-use section on High Point Lane and (2) a warehouse in the back. The front section on High Point Lane will have a 1,680 sf footprint (28’ by 60’) comprised of office and storage on the basement level, a showroom on the High Point Lane ground floor, and two apartments on the 2" floor. The warehouse section in the back is open three stories to the ceiling with a 6,720 sf footprint (112’ by 60'). | June 2, 2016 |
653 M3 | Dias Wastewater Modification | Tisbury (Vineyard Haven) | To modify condition requiring installation of composting toilets in the upstairs apartments. | July 12, 2018 |
656 | DeBettencourt Garage High Point Lane | Tisbury (Vineyard Haven) | Major topographical alteration to prepare a site for a 5,166 gsf (4,500 sf footprint) vehicle repair garage with three repair bays able to accommodate trucks, a vehicle inspection station, offices, waiting area, and storage | |
657 | Polly Hill Education Center | West Tisbury | Demolition of an 1870's barn and construction of a 2,650 s.f. two-story education center with classrooms, botany lab, herbarium, and offices. | September 17, 2015 |
658 | Beach Street Demolition | Edgartown | Demolition of a two-story house built in 1890 and replacement with a house of similar design. | October 1, 2015 |
659 | North Bluff Sea Wall | Oak Bluffs | Provide enhanced coastal storm protection against projected sea level rise by creating a stone revetment (3-4 ton), raised sheet metal seawall (4’ higher than the existing concrete sea wall), restored coastal bank and construct a timber boardwalk to provide a pedestrian link between the SSA Ferry Facility and the Oak Bluffs Harbor. | January 7, 2016 |
659 M | North Bluff Modification | Oak Bluffs | Modification to North Bluff Seawall project, including roundabout and parking. | December 15, 2022 |
660 | Oak Bluffs Water District Solar Farm | Oak Bluffs | Revised proposal to construct a 1.46 +/- MW Solar Farm within a cleared area of 10.37 acres between Well # 3 and Well # 4 on O.B. Water District property containing wells 3, 4, & 5. The solar panels would be in the Zone 2 Area of Contribution with some clearing in two Zone 1 Areas of Contribution. | |
661 | Squibnocket Parking Lot Relocation | Chilmark | Relocation of the Squibnocket Beach parking lot inland from the existing revetment which will be the subject of beach restoration. The project consists of beach restoration, parking lot, roadway and utility relocation. The project is being reviewed concurrently with an abutting project by the Squibnocket Ridge Subdivision which is relocating their access road to a new 300 foot long causeway/bridge. | April 28, 2016 |
662 | Chappy Wireless Antenna | Edgartown | 2016 Approval Granted Extension 5/10/2018. To locate a wireless communications facility, including without limitation a 104-foot ballast mounted concealed antenna monopole with 3 guy wires and anchors, 3 panel antennas, a ground mounted dish antenna of 6 feet in diameter, coaxial cables, and 2 radio communications equipment cabinets to be located within an existing building. | April 14, 2016 |
662 M | Chappaquiddick Permanent Tower | Edgartown | Proposal to build a permanent 115 foot high monopole on same property as temporary tower. | January 25, 2018 |
663 | Phillips Hardware New Mixed-Use Building | Oak Bluffs | A proposal to demolish an existing (1 and 3 story) building to be replaced by a three-story mixed-use building on Circuit Avenue. | |
663 M | Phillip's Modification to Apartment Use | Oak Bluffs | Proposed modification to change the approved use of the residential portion of the project from “Hotel” to “Apartment”. | February 15, 2018 |
663 M2 | Phillips Hardware Mixed Use Roof Modification | Oak Bluffs | Proposal to alter the roof in the center of the building to be flatter and less elevated than the original design. | |
664 | Featherstone Art Barn & Pottery Studio | Oak Bluffs | The proposal includes the demolition of two existing buildings (total app 3,330 sf) and the construction of two new bigger buildings with a total of 8,800 sf. The proposal includes the demolition of the art barn and the construction of a new bigger Art Barn with offices, classrooms, a commercial kitchen, and a gallery and a new pottery studio at the Featherstone Center for the Arts. | |
665 | M.V. Museum @ Marine Hospital | Tisbury (Vineyard Haven) | Phase 1: Renovation of existing 3-story 10,525 sf Marine Hospital built in 1895 with a 2-story 4,738 sf new "Fresnel Pavilion" and related site work AND Phase 2: new 2-story 9,983 sf gallery wing and 2-story 848 sf connector building. The Proposal also includes the demolition of the 1935 brick addition to the Marine Hospital. | May 30, 2017 |
665 M | MV Museum | Tisbury (Vineyard Haven) | Modifications to the M.V. Museum site plan based upon adjustments to archaeological features discovered during the excavation and construction process. | June 21, 2018 |
667 | Beryl Way Historic Demolition | Oak Bluffs | Proposal to demolish a 650 sf former MVCMA Campground Cottage built in 1875. | |
668 | Airport Fire Station | West Tisbury | Proposed replacement building for the Fire Station and Snow Removal Equipment at the Airport. | |
669 | Sydney Hotel Expansion | Edgartown | Construction of new addition on vacant lot with 14 rooms, employee housing and 2 retail shops to the existing Sydney Hotel (location of l'etoile restaurant) | January 5, 2017 |
670 | Lampost Conversion | Oak Bluffs | Conversion of upper floors from night club to employee housing. | |
670 M | Lampost Workforce Housing Reconfiguration | Oak Bluffs | Proposed reconfiguration of workforce housing units on upper floors. | June 14, 2018 |
670 M2 | Lampost Workforce Housing - Compliance & Modification to Housing Conditions | Oak Bluffs | Determination of compliance and modification to the housing conditions for DRI 670-M to reduce the number of units restricted to workforce housing from 10 to 4. | June 9, 2022 |
Pages
Office location:
Office location:
The Stone Building
33 New York Avenue
Oak Bluffs, MA 02557
Telephone: 508-693-3453
Fax: 508-693-7894
Mailing Address
Mailing address:
Martha's Vineyard Commission
P.O. Box 1447
Oak Bluffs, MA 02557
About the MVC
Site Map
Copyright
© 2008 - 2025
Martha's Vineyard Commission
All Rights Reserved