Previous DRIs
Number![]() |
Name | Town | Description | Decision Date |
---|---|---|---|---|
670 M | Lampost Workforce Housing Reconfiguration | Oak Bluffs | Proposed reconfiguration of workforce housing units on upper floors. | June 14, 2018 |
670 M2 | Lampost Workforce Housing - Compliance & Modification to Housing Conditions | Oak Bluffs | Determination of compliance and modification to the housing conditions for DRI 670-M to reduce the number of units restricted to workforce housing from 10 to 4. | June 9, 2022 |
671 | Rivera ANR | Chilmark | Proposed fourth ANR division of land on a piece of property that was 20.7 acres in 1980. | |
672 | Damroth Subdivision | Chilmark | 4 Lot Subdivision of 14 Acres | July 6, 2017 |
673 | Mayhew Subdivision | Chilmark | 4 Lot Subdivision of 13.62 acres | April 6, 2017 |
674 | Santander Historic Roof Tiles | Tisbury (Vineyard Haven) | DRI Review of removal of historic clay tiles replaced by asphalt shingles on 111 year old iconic stone building. | July 6, 2017 |
674 M | Old Stone Bank Condos | Tisbury (Vineyard Haven) | Proposal to renovate the two existing buildings on the property and construct five new buildings for a total of 11 condo units and six commercial units. | May 13, 2021 |
674 M2 | Old Stone Bank Condos Modification of Decision | Tisbury (Vineyard Haven) | Modification of Condition 2.1 from the DRI 674-M Decision recorded on May 14, 2021. | |
674 M3 | Stone Bank Restaurant | Tisbury (Vineyard Haven) | Modification of DRI 674-M to allow for a 70-seat outdoor restaurant with indoor kitchen. | March 9, 2023 |
674 M4 | Stone Bank Condos Modifications | Tisbury (Vineyard Haven) | Modifications including elimination of second floor of drive-through building, elimination of rooftop solar panels, and addition of a deck and balcony. | |
674 M5 | Stone Bank Development Modifications | Tisbury (Vineyard Haven) | Review potential compliance issues, of unapproved modifications, and of a landscape plan, a lighting plan, and other post-decision items. | |
674 M7 | El Barco Modifications | Tisbury (Vineyard Haven) | The proposed addition of television screens to the taqueria bar, proposed steps to offset the visual impact of kitchen venting, and other modifications. | |
674 M8 | 20 Union Court Alteration | Tisbury (Vineyard Haven) | A modification of a previous DRI. Specifically, the addition of a dormer to a condominium dwelling that abuts a private driveway. | January 23, 2025 |
675 | Westman Historic Demolition 29 Franklin | Tisbury (Vineyard Haven) | To be permitted to demolish a Greek revival house in Tisbury built in 1850. | July 6, 2017 |
677 | Verizon Tower Height Extension | Tisbury (Vineyard Haven) | Height of Verizon Tower used to transmit landline calls and Internet access via narrow width microwave between Vineyard Haven and Falmouth (also handles Nantucket) will be increased from 77 feet above ground level to 130 feet ± above ground. | July 11, 2019 |
678 | O.B. Town Hall | Oak Bluffs | To demolish the existing Town Hall and construct a new 3-story 21,000 G. S.F. Town Hall (w/partial basement) on the same site. | November 2, 2017 |
678 M | Oak Bluffs Town Hall Modifications | Oak Bluffs | Modifications to the proposed Town Hall originally approved in 2017 | |
678 M2 | Oak Bluffs Town Hall Flagpole Modification | Oak Bluffs | Request to modify DRI 678 by leaving flagpole in as-built location. | |
679 | East Chop Bluff Repair | Oak Bluffs | The stabilization of approximately 2,400 linear feet of coastal bank located along East Chop Drive in Oak Bluffs. | April 5, 2018 |
680 | Old WT Town Hall/Library Demolition | West Tisbury | To demolish a building built in 1892 that has served in the past as the West Tisbury Town Hall and as a fire station. | April 5, 2018 |
681 | Green Ave Historic Demolition | Edgartown | Proposal to demolish the existing barn on the property, a portion of which may be considered historically significant, and attach a new garage to the existing home. | April 12, 2018 |
682 | Meeting House Way Subdivision | Edgartown | Proposed 36-home residential subdivision on 54 acres. | |
682 A | Meeting House Place Subdivision Re-design | Edgartown | Previously DRI 682; revised proposal to create 28 residential lots and up to 10 income-restricted townhouses on 54 acres. | |
682 B | Meeting House Way 2nd Redesign | Edgartown | This is a Form C definitive subdivision proposal to take 5 parcels spanning 54 acres and subdivide into 28 single family residences with 14 townhouses on the 29th proposed lot. | |
683 | Division Road ANR | Edgartown | Review of Five (5) lot Form A (ANR) division of property. | June 21, 2018 |
Pages
Office location:
Office location:
The Stone Building
33 New York Avenue
Oak Bluffs, MA 02557
Telephone: 508-693-3453
Fax: 508-693-7894
Mailing Address
Mailing address:
Martha's Vineyard Commission
P.O. Box 1447
Oak Bluffs, MA 02557
About the MVC
Site Map
Copyright
© 2008 - 2025
Martha's Vineyard Commission
All Rights Reserved