LUPC Agenda
- Preferred version: https://www.mvcommission.org/node/51320/attachment
- Newest version: https://www.mvcommission.org/node/51320/attachment/newest
Description:
Martha's Vineyard Commission
Land Use Planning Committee Meeting
Date: June 1, 2015 @ 5:30 p.m.
Place: MVC Offices
Stone Building, 33 New York Avenue, Oak Bluffs, MA
AGENDA
1. Project – Cape Cod Five Building
DRI No. 631-M2
Proposal: The proposal is to demolish both existing buildings at 412 State Road and build a single one-story 1,590 sf bank building with a two-lane drive-through
Location: 412 State Road, Tisbury Map 22-A Lot 9 (1.01 acres)
Purpose: To review the project, discuss possible conditions and decide whether or not to make a recommendation to the full Commission to deny, approve, or approve with conditions.
2. Project – Island Source Airport Storage
DRI No. 652
Proposal: To construct a 20,625 sf one-story storage facility with 152 units of various sizes. The property currently has a 6,000 sf industrial building that houses Island Source bottled water and several catering kitchens.
Location: 10 North Line Road, Edgartown Map 24 Lot 2.29 (1.8 acres)
Purpose: To review the project and the proposed scope of the traffic study, schedule a site visit, and discuss when the project will be prepared for a public hearing.
3. Project – Dias High Point Lane
DRI No. 653
Proposal: To construct a 5700 sf. metal building for wholesale lumber storage, an office, and an apartment.
Location: High Point Lane, Tisbury Map 22-A Lot 13.11
Purpose: To review the project and the proposed scope of the traffic study, schedule a site visit, and discuss when the project will be prepared for a public hearing.
Attach File:
Document Date:
Thursday, May 28, 2015
Project Type:
DRI
Resource Type: